Industrial

Modern Molding Inc.

This growing injection molding company elected to work with SourceGroup because of our value engineering insights and the integrity they felt we brought to the bidding and design development process. Over the course of three months SourceGroup worked with the owner to redesign various architectural, structural, mechanical and electrical systems that had been over-engineered, resulting in the project coming in over budget.

One of the project requirements was to upgrade the building’s electrical service from a 240 high-leg delta to a 480-volt service. A change that would substantially reduce energy bills and make it possible to incorporate more cost-effective electrical presses that would decrease long-term operating and maintenance costs. SourceGroup worked closely with the electrical utility to complete the upgrade without interrupting electrical service to the building – making it possible for MMI to keep the production line fully functional.

Square Feet: 36,000 (new), 5,000 (remodel)
Modern Molding

CDI

The design of this industrial warehouse incorporates 4,800 square feet of office space with 27,200 square feet of manufacturing space. The site design also allows accommodations for 11,000 square feet of expansion.

Adding to the owner’s desire and foster efficiency and productivity, a state-of-the art ventilation and dust collection system, and overhead bridge crane were incorporated with the facilities five loading docks and two drive-in loading bays.

After just two years, CDI hit their five-year projections and now run three shifts, six days a week.

Square Feet: 32,000
CDI

Viking Electric

Viking needed a facility that could meet the many needs of their growing business. The building’s design successfully integrated administrative office, showroom, warehouse and loading dock space. Located in an industrial area, a pre-engineered “metal” building was ultimately chosen for its low cost and ease of construction.

Square Feet: 24,000
Viking Electric

Solar Plastics

When brand names like Toro, Satellite Industries, Polaris and Yeti Coolers started demanding more production capacity, Solar Plastics contracted with our team to help develop a cost-effective plan to renovate existing general administrative areas and add manufacturing/production space to keep pace with their clients’ ever-expanding needs.

Delano, Minnesota
Square Feet: 24,000
Solar Plastics